Order commercial and milspec universal power module in our connectors electrical components category.
Part Number | Description | Availability |
---|---|---|
1-1903978-1 | Slim upm 4pos. rec. assy,s |
Lead Time: 15 weeks |
120943-1 | Micro tca connectors assembly, r/a upm recpt, 3 pos |
Lead Time: 12 weeks |
120943-2 | Heavy duty power connectors assembly, r/a upm recpt, 4p |
Lead Time: 13 weeks |
120943-3 | Heavy duty power connectors assembly, r/a upm recpt 5p |
Lead Time: 18 weeks |
120943-4 | Hard metric connectors assy r/a upm recpt 6 pos |
Lead Time: 10 weeks |
120943-5 | High speed / modular connectors recpt 7p vert no key power module |
Lead Time: 75 weeks |
120943-6 | Heavy duty power connectors assembly, r/a upm recpt, 8 pos |
Lead Time: 11 weeks |
120943-7 | Hard metric connectors assy r/a upm recpt 9 pos |
Lead Time: 12 weeks |
120953-1 | Universal power module (for use with z-pack 2mm hm, z-pack hs3, z-pack hm-zd and multi gig rt2j) |
Lead Time: 15 weeks |
120953-2 | Universal power module (for use with z-pack 2mm hm, z-pack hs3, z-pack hm-zd and multi gig rt2j) |
Lead Time: 19 weeks |
120953-3 | Universal power module (for use with z-pack 2mm hm, z-pack hs3, z-pack hm-zd and multi gig rt2j) |
Lead Time: 15 weeks |
120953-4 | Universal power module (for use with z-pack 2mm hm, z-pack hs3, z-pack hm-zd and multi gig rt2j) |
Lead Time: 4 weeks |
120953-5 | Universal power module (for use with z-pack 2mm hm, z-pack hs3, z-pack hm-zd and multi gig rt2j) |
Lead Time: 15 weeks |
120954-1 | Universal power module (for use with z-pack 2mm hm, z-pack hs3, z-pack hm-zd and multi gig rt2j) |
Lead Time: 13 weeks |
120954-2 | Hard metric connectors upm expnd pin assy |
Lead Time: 22 weeks |
120954-3 | Upm expanded pin assembly |
Lead Time: 22 weeks |
120954-5 | Mini power modules |
Lead Time: 22 weeks |
120954-6 | Power to the board upm expanded pin assembly |
Lead Time: 22 weeks |
120955-1 | Universal power module (for use with z-pack 2mm hm, z-pack hs3, z-pack hm-zd and multi gig rt2j) |
Lead Time: 17 weeks |
120956-1 | High speed / modular connectors upm expnd pin assy |
Lead Time: 19 weeks |
120956-2 | Power to the board upm expnd pin assy |
Lead Time: 22 weeks |
120957-1 | Universal power module (for use with z-pack 2mm hm, z-pack hs3, z-pack hm-zd and multi gig rt2j) |
Lead Time: 15 weeks |
120957-2 | Universal power module (for use with z-pack 2mm hm, z-pack hs3, z-pack hm-zd and multi gig rt2j) |
Lead Time: 13 weeks |
120958-1 | Universal power module (for use with z-pack 2mm hm, z-pack hs3, z-pack hm-zd and multi gig rt2j) |
Lead Time: 13 weeks |
120958-2 | Universal power module (for use with z-pack 2mm hm, z-pack hs3, z-pack hm-zd and multi gig rt2j) |
Lead Time: 13 weeks |