Spiral wrap chafe guard required to cover braided conduit over its fulllength. Capture shrink tubing at each end of the braided section to cover the adapter and from one to two inches of the spiral wrap. (.58) diameter applies over spiral wrapped area only; inductance of lead not to exceed.30 microhenries per foot; chafe guard required to cover required braided conduit and adaptor at each end of braided section.No fraying permitted..58-.62 applies over braided section to within 1.0-2.0 inch of adaptor edge; brazing alloycontailning nickel shall be used to braze aisi-400 series matl ref
NSN 5965-01-435-3414
NSN 5999-01-062-2109
NSN 5990-01-294-6198
NSN 6220-01-003-9126
NSN 5920-00-598-0469
NSN 5998-00-395-0804
NSN 6110-00-227-0578
NSN 6620-01-462-1625
NSN 5925-01-564-4645
NSN 5950-01-505-3517
NSN 5925-00-764-8349
NSN 6240-00-344-8582
Last Updated: 03/09/2025