Spiral wrap chafe guard required to cover braided conduit over its fulllength. Capture shrink tubing at each end of the braided section to cover the adapter and from one to two inches of the spiral wrap. (.58) diameter applies over spiral wrapped area only; inductance of lead not to exceed.30 microhenries per foot; chafe guard required to cover required braided conduit and adaptor at each end of braided section.No fraying permitted..58-.62 applies over braided section to within 1.0-2.0 inch of adaptor edge; brazing alloycontailning nickel shall be used to braze aisi-400 series matl ref
NSN 6220-01-102-8805
NSN 5905-01-363-9891
NSN 6650-01-062-1926
NSN 5950-00-168-5832
NSN 5925-00-789-3718
NSN 6150-00-132-1640
NSN 6130-01-243-5807
NSN 5945-00-901-2235
NSN 6620-01-648-1594
NSN 5990-01-106-3786
NSN 6145-01-391-2974
NSN 5960-01-011-8687
Last Updated: 01/02/2025