Spiral wrap chafe guard required to cover braided conduit over its fulllength. Capture shrink tubing at each end of the braided section to cover the adapter and from one to two inches of the spiral wrap. (.58) diameter applies over spiral wrapped area only; inductance of lead not to exceed.30 microhenries per foot; chafe guard required to cover required braided conduit and adaptor at each end of braided section.No fraying permitted..58-.62 applies over braided section to within 1.0-2.0 inch of adaptor edge; brazing alloycontailning nickel shall be used to braze aisi-400 series matl ref
NSN 6110-01-659-2025
NSN 5905-00-084-1193
NSN 6150-00-390-3422
NSN 6610-01-383-4458
NSN 5935-01-325-5006
NSN 5990-01-649-4647
NSN 6685-00-270-0692
NSN 6685-01-456-5464
NSN 5835-01-116-2369
NSN 5999-01-055-6571
NSN 5925-00-819-3985
NSN 5895-00-243-1959
Last Updated: 04/19/2024