Spiral wrap chafe guard required to cover braided conduit over its fulllength. Capture shrink tubing at each end of the braided section to cover the adapter and from one to two inches of the spiral wrap. (.58) diameter applies over spiral wrapped area only; inductance of lead not to exceed.30 microhenries per foot; chafe guard required to cover required braided conduit and adaptor at each end of braided section.No fraying permitted..58-.62 applies over braided section to within 1.0-2.0 inch of adaptor edge; brazing alloycontailning nickel shall be used to braze aisi-400 series matl ref
NSN 5998-01-310-3844
NSN 6105-00-900-2486
NSN 5855-00-237-4088
NSN 5915-00-387-2333
NSN 6610-00-919-3875
NSN 5999-00-080-6514
NSN 6685-00-876-3167
NSN 5975-00-889-0496
NSN 7035-01-344-8708
NSN 6650-01-658-4145
NSN 5925-00-506-6130
NSN 5985-01-188-7408