Spiral wrap chafe guard required to cover braided conduit over its fulllength. Capture shrink tubing at each end of the braided section to cover the adapter and from one to two inches of the spiral wrap. (.58) diameter applies over spiral wrapped area only; inductance of lead not to exceed.30 microhenries per foot; chafe guard required to cover required braided conduit and adaptor at each end of braided section.No fraying permitted..58-.62 applies over braided section to within 1.0-2.0 inch of adaptor edge; brazing alloycontailning nickel shall be used to braze aisi-400 series matl ref
NSN 5990-01-040-1320
NSN 6645-01-132-7806
NSN 5975-01-328-8548
NSN 7035-01-593-9152
NSN 5835-01-158-6878
NSN 5990-01-411-5930
NSN 5930-01-211-0092
NSN 4140-01-273-0196
NSN 5930-01-132-6580
NSN 6145-00-378-3836
NSN 5935-01-211-3170
NSN 5999-01-322-8578
Last Updated: 03/29/2024